SunTrust Bank Building Atlanta, GA 30303, USA Description: SunTrust Regional Office Building, Skyscraper, 28 stories, built in 1971. Issue: Old cooling tower with chronic performance and maintenance issues. Costly and unpredictable repairs. Solution: Removal of old tower and the “field erected” installation of one (1) 2000 Ton Cooling Tower. This replacement tower was broken down into 4 foot sections and reconstructed on the rooftop. Benefit: With the elimination of emergency service, repair and parts, and the new system’s design for higher efficiency, operating cost decreased 24% on average. Customers, staff, tenants and guest all enjoy optimal indoor air quality and consistent temperature throughout this skyscraper. |
DoubleTree Hotel Little Rock Little Rock, Arkansas, 72201, USA Description: Hotel, 14 Floors, 288 Rooms Issue: Costly repair and service of obsolete guestroom PTACS. Uncontrollable room temperature issues. Solution: Installation of 400 new high efficiency PTACS. Benefit: Lower operating cost with new higher energy efficient PTACS and elimination of costly down time and repair service, sustainable guest room temperature control and environment. |
Town Center Mall, Kennesaw, Georgia 30144, USA Description: Regional shopping mall, 1.26M sq. /ft., 2 floors. Anchored by Macy’s, Macy’s Men & Furniture Gallery, Sears, JC Penny, Belk, and 200+ specialty shops. Issue: Built in 1985, its manual HVAC System was in constant repair, repair and parts cost rising. Mounting tenant and shopper complaints about lack of consistent indoor temperature inconsistency. Solution: Design/Build; Removal and installation of three (3) 100 Ton Roof HVAC Units, with HVAC Controls. Benefit: Lower and predictable operating cost with a new high efficiency system, improved indoor air quality and optimal temperature control, with comfort throughout the entire facility, increase in tenant occupancy and shopper comfort and satisfaction. |
Marriott Northwest at Galleria Atlanta, Georgia 30339, USA Description: Hotel, 16 Floors, 400 Rooms Issue: Costly repair and service of obsolete quest room PTACS. Uncontrollable room temperature issues Solution:Installation of 400 new high efficiency PTACS. Benefit: Lower operating cost with higher energy efficient system and elimination of costly down time and repair service, sustainable guest room temperature control and environment. |
Holiday Inn Select Perimeter 4386 Chamblee Dunwoody Rd. Atlanta, GA 30341 Description: Hotel, 5 Floors, 250 Rooms Project Scope: Customer operation cost were high due to old inefficient HVAC equipment, high water usage. Poor air quality throughout the facility inducing high levels of mold and odor. Solution: Replaced, all lavatories and toilets. Complete HVAC replacement. Design and installed Air Recovery System. Benefit: Lower and predictable operating cost with a new high efficiency system, improved indoor air quality and optimal temperature control for staff and customer comfort throughout the entire hotel. |
Selig Enterprises, Inc. Atlanta, Georgia 30390, USA Description: Selig Enterprises provides leasing, development, construction, and property management services for more than 250 properties in the U.S. Issue: Its aging HVAC System was unreliable, in constant repair, indoor air temperatures unpredictable. Tenants and staff complained about the temperature fluctuations. Solution: Designed and installed an Emergency Management “Monitored” HVAC System, new cooling tower and heating water pumps. Benefit: Lower and predictable operating cost with a new high efficiency system, improved indoor air quality and optimal temperature control and comfort throughout the entire facility. |
MSES is Energy.Efficiency.Excellence and… Service.