SunTrust Bank Building
Atlanta, GA 30303, USA
Description: SunTrust Regional Office Building,

Skyscraper, 28 stories, built in 1971.

Issue: Old cooling tower with chronic performance and maintenance issues. Costly and unpredictable repairs.
Solution: Removal of old tower and the “field erected” installation of one (1) 2000 Ton Cooling Tower. This replacement tower was broken down into 4 foot sections and reconstructed on the rooftop.
Benefit: With the elimination of emergency service, repair and parts, and the new system’s design for higher efficiency, operating cost decreased 24% on average. Customers, staff, tenants and guest all enjoy optimal indoor air quality and consistent temperature throughout this skyscraper.
DoubleTree Hotel Little Rock
Little Rock, Arkansas, 72201, USA
Description: Hotel, 14 Floors, 288 Rooms

Issue: Costly repair and service of obsolete guestroom PTACS. Uncontrollable room temperature issues.
Solution: Installation of 400 new high efficiency PTACS.
Benefit: Lower operating cost with new higher energy efficient PTACS and elimination of costly down time and repair service, sustainable guest room temperature control and environment.
Town Center Mall,
Kennesaw, Georgia 30144, USA

Description: Regional shopping mall, 1.26M sq. /ft., 2 floors. Anchored by Macy’s, Macy’s Men & Furniture Gallery, Sears, JC Penny, Belk, and 200+ specialty shops.
Issue: Built in 1985, its manual HVAC System was in constant repair, repair and parts cost rising. Mounting tenant and shopper complaints about lack of consistent indoor temperature inconsistency.
Solution: Design/Build; Removal and installation of three (3) 100 Ton Roof HVAC Units, with HVAC Controls.
Benefit: Lower and predictable operating cost with a new high efficiency system, improved indoor air quality and optimal temperature control, with comfort throughout the entire facility, increase in tenant occupancy and shopper comfort and satisfaction.
Marriott Northwest at Galleria
Atlanta, Georgia 30339, USA
Description: Hotel, 16 Floors, 400 Rooms

Issue: Costly repair and service of obsolete quest room PTACS. Uncontrollable room temperature issues
Solution:Installation of 400 new high efficiency PTACS.
Benefit: Lower operating cost with higher energy efficient system and elimination of costly down time and repair service, sustainable guest room temperature control and environment.
Holiday Inn Select Perimeter
4386 Chamblee Dunwoody Rd.
Atlanta, GA 30341
Description: Hotel, 5 Floors, 250 Rooms

Project Scope: Customer operation cost were high due to old inefficient HVAC equipment, high water usage. Poor air quality throughout the facility inducing high levels of mold and odor.
Solution: Replaced, all lavatories and toilets. Complete HVAC replacement. Design and installed Air Recovery System.
Benefit: Lower and predictable operating cost with a new high efficiency system, improved indoor air quality and optimal temperature control for staff and customer comfort throughout the entire hotel.
Selig Enterprises, Inc.
Atlanta, Georgia 30390, USA
Description: Selig Enterprises provides leasing, development, construction, and property management services for more than 250 properties in the U.S.

Issue: Its aging HVAC System was unreliable, in constant repair, indoor air temperatures unpredictable. Tenants and staff complained about the temperature fluctuations.
Solution: Designed and installed an Emergency Management “Monitored” HVAC System, new cooling tower and heating water pumps.
Benefit: Lower and predictable operating cost with a new high efficiency system, improved indoor air quality and optimal temperature control and comfort throughout the entire facility.